Datenblatt-Suchmaschine für elektronische Bauteile |
|
1--21000--7 Datenblatt(PDF) 2 Page - TE Connectivity Ltd |
|
|
1--21000--7 Datenblatt(HTML) 2 Page - TE Connectivity Ltd |
2 / 6 page 408- 9426 Rev E 2 of 6 Adjustable Stop—controls the size of the connector slot, permitting different size connectors to be secured in head assembly. Wire Guide—open channel into which unstripped wire is inserted and bottomed for terminating. Feed Pawl—when pushed forward, allows carriage to be moved either right or left, depending on where connector is to be located in head assembly. The wire is terminated in the connector contact using the insulation displacement technique (a terminating technique which inserts unstripped wire into a slotted contact beam to form a reliable electrical connection between the wire and the contact). Contact termination is complete when the tool is actuated. 3. SETUP The setup procedure consists of determining the size of the connector slot, securing the connector in that slot, and positioning the connector for termination. Proceed as follows: 1. To determine the size of slot required for the connector to be terminated, push the feed pawl forward and slide the carriage to the left as far as it will go. Then loosen the socket head cap screw located at bottom side of the adjustable stop (shown in Figure 2), allowing the stop to be moved right or left. Figure 2 Push Feed Pawl Forward Socket Head Cap Screw Connector Slot Adjustable Stop 2. Orient the connector with the head assembly as shown in Figure 3 — the open part of the insulation displacement slot is up and facing the back of the tool. Making sure that the connector slot is large enough to accept the connector, fit the connector in slot. Then move the adjustable stop flush against the connector, and tighten the socket head cap screw securing the connector to the head assembly. 3. Push the feed pawl forward and slide the carriage (with connector) to the right as far as it will go. Then release the feed pawl. The connector is now in position to begin termination. 4. TEST TERMINATION AND INSPECTION At least one termination should be performed and inspected before starting production terminating. The steps which follow are recommended to perform the test termination and inspection. Figure 3 Open Part of Contact Insulation Displacement Slot Up and Facing Back of Tool Adjustable Stop Moved to Allow Connector to Fit into Connector Slot Connector Slot Back of Tool (Ref) Horizontal Mount Header Vertical Mount Header Receptacle Assembly 1. Perform the setup procedure as described in Section 3. Note that at the end of this procedure the connector is in position to begin the termination process. 2. Without inserting the wire into the wire guide, perform one cycle. The connector will be indexed in position for the first termination. 3. Insert an unstripped wire into the wire guide until the wire bottoms, making sure wire is centered in theslot. SeeFigure4. 4. Perform one termination cycle: the inserter will bottom, forcing the wire between the contact slots, and will then retract. The connector will advance to the next contact position. |
Ähnliche Teilenummer - 1--21000--7 |
|
Ähnliche Beschreibung - 1--21000--7 |
|
|
Link URL |
Privatsphäre und Datenschutz |
ALLDATASHEETDE.COM |
War ALLDATASHEET hilfreich? [ DONATE ] |
Über Alldatasheet | Werbung | Kontakt | Privatsphäre und Datenschutz | Linktausch | Hersteller All Rights Reserved©Alldatasheet.com |
Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
Family Site : ic2ic.com |
icmetro.com |