| Datenblatt-Suchmaschine für elektronische Bauteile |
|
LT1952IGN Datenblatt(PDF) 18 Page - Linear Technology |
|
|
|||||||||||||||||||||||||||||
LT1952IGN Datenblatt(HTML) 18 Page - Linear Technology |
|
18 / 24 page ![]() LT1952 18 1952f APPLICATIO S I FOR ATIO to give, t = RC • (–1) • ln(1 – VSS/SS_MAXDC(DC)) where, VSS = SS_MAXDC voltage at time t SS_MAXDC(DC) = programmed DC voltage setting maximum duty cycle clamp = VREF(RB/(RT + RB) R = RCHARGE (Figure 11) = RT • RB/(RT + RB) C = CSS (Figure 11) Example (1) No Switching Period The period of no switching for the converter, when a soft-start event has occurred, depends on how far SS_MAXDC can fall before recharging occurs and how long a fault exists. It will be assumed that a fault triggering soft-start is removed before SS_MAXDC can reach its reset threshold (0.45V). No Switching Period = tDISCHARGE + tCHARGE tDISCHARGE = discharge time from SS_MAXDC(DC) to 0.45V tCHARGE = charge time from 0.45V to VSS(ACTIVE) tDISCHARGE was already calculated earlier as 185µs. tCHARGE is calculated by assuming the following: VREF = 2.5V, RT = 35.7k, RB = 100k, CSS = 0.1µF and VSS(MIN) = 0.45V. tCHARGE = t(VSS = 0.8V) – t(VSS = 0.45V) Step 1: SS_MAXDC(DC) = 2.5[100k/(35.7k + 100k)] = 1.84V RCHARGE = (35.7k • 100k/135.7k) = 26.3k Step 2: t(VSS = 0.45V) is calculated from, t = RCHARGE • CSS • (–1) • ln(1 – VSS/SS_MAXDC(DC)) = 2.63e4 • 1e–7 • (–1) • ln(1 – 0.45/1.84) = 2.63e–3 • (–1) • ln(0.755) = 7.3e–4 s Step 3: t(VSS = 0.8V) is calculated from, t = RCHARGE • CSS • (–1) • ln(1 – VSS/SS_MAXDC(DC)) = 2.63e4 • 1e–7 • (–1) • ln(1 – 0.8/1.84) = 2.63e–3 • (–1) • ln(0.565) = 1.5e–3 s From Step 1 and Step 2 tCHARGE = (1.5 – 0.73)e–3 s = 7.7e–4 s The total time of no switching for the converter due to a soft-start event = tDISCHARGE + tCHARGE = 1.85e–4 + 7.7e–4 = 9.55e–4 s Example (2) Converter Output Rise Time The rise time for the converter output to reach regulation can be closely approximated as the time between the start of switching (SS_MAXDC = VSS(ACTIVE)) and the time where converter duty cycle is in regulation (DC(REG)) and no longer controlled by SS_MAXDC (SS_MAXDC = VSS(REG)). Converter output rise time can be expressed as, Output Rise Time = t(VSS(REG)) – t(VSS(ACTIVE)) Step 1: Determine converter duty cycle DC(REG) for output in regulation The natural duty cycle DC(REG) of the converter depends on several factors. For this example it is assumed that DC(REG) = 60% for system input voltage near the undervoltage lockout threshold (UVLO). This gives SD_VSEC = 1.32V. Also assume that the maximum duty cycle clamp pro- grammed for this condition is 72% for SS_MAXDC(DC) = 1.84V, fOSC = 200kHz and RDELAY = 40k. Step 2: Calculate VSS(REG) To calculate the level of SS_MAXDC (VSS(REG)) that no longer clamps the natural duty cycle of the converter, the equation for maximum duty cycle clamp must be used (see previous section ‘Programming Maximum Duty Cycle Clamp’). The point where the maximum duty cycle clamp meets DC(REG) during soft-start is given by, DC(REG) = Max Duty Cycle clamp |
|
|
Link URL |
| War ALLDATASHEET hilfreich? [ DONATE ] |
Über Alldatasheet | Werbung | Kontakt | Privatsphäre und Datenschutz | Link zum Datenblatt | Linktausch | Hersteller All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |